Technical Guidelines

Technical Guidelines

01 - General

Responsible: Manager Engineering Technical Services - Murat Aksoy
Legacy Number
New Number
Title
Version
TG 110 TG 0100 Safety In Design 1

02 - Mechanical & Hydraulics

Responsible: Principal Engineer, Mechanical & Hydraulics  - Gordon Holmes
Legacy Number
New Number
Title
Version
TG 32 TG 0210 Hydraulic Aspects of Pumping and Gravity Mains 1

03 - Electrical

Responsible: Principal Engineer, Electrical - Justin Hamra
Legacy
Number
New
Number
Title
Version
    

05 - Reticulation Networks

Responsible: Principal Engineer, Reticulation Networks - Tom Galek
Legacy Number
New Number
Title
Version
TG 11a TG 0500 The Design Of Sewerage Systems (Extract Of Par 4 And 5) 1

06 - Civil

Responsible: Principal Engineer, Civil & Structural - Hany Habib
Legacy
Number
New
Number
Title
Version
TG 96 TG 0621
The Design Of Anchors And Thrust Blocks On Buried Pipelines
With Unrestrained Flexible Join And For The Anchorage Of Pipes On Steep Grades
1
TG 104 TG 0622 Design Of Pipe End Dissipators 1

06 - Civil (Geotechnical)

Responsible: Principal Engineer, Dams and Geotechnical - Moji Kan
General technical information for geotechnical design comprising of 10 sections
Legacy
Number
New
Number
Title
Version
TG 10c TG 0631 General Technical Information for Geotechnical Design - Earthworks 2
TG 10a TG 0632
General Technical Information for Geotechnical Design - Compaction
2
TG 10g TG 0633 General Technical Information for Geotechnical Design - Course Geomaterials in Civil Works2
TG 10l TG 0634 General Technical Information for Geotechnical Design - Soil Testing 2
TG 10h TG 0635 General Technical Information for Geotechnical Design - Permeability 2
TG 10f TG 0636 General Technical Information for Geotechnical Design - Lined Storages 2
TG 10j TG 0637 General Technical Information for Geotechnical Design Part J - Pipelines 1
TG 10e TG 0638 General Technical Information for Geotechnical Design Part E - Hydrogeology 1
TG 10i TG 0639 General Technical Information for Geotechnical Design Part I - Pile Driving 1
TG 10m TG 0640 General Technical Information for Geotechnical Design Part M - Survey Pillars 1

07 - Structural

Responsible: Principal Engineer, Civil & Structural - Hany Habib
Legacy
Number
New
Number
Title
Version
TG 106 TG 0720 Above Ground Circular Concrete Tanks1

  • Major faults

  • Underway

  • Hazel St
  • Pooraka
  • 12/11/2019
  • Water Supply On
  • 12/11/2019 08:37 AM - We are attending to an incident in Pooraka with no interruption to the water supply. The safety of our crews and customers comes first, and we always aim to minimise inconvenience by restoring services as quickly as we can. Reference Number WO: 07204510.
  • See all major faults

  • Scheduled works

  • Underway
  • Sprod Av
  • Toorak Gardens
  • 14/11/2019
  • Temporary Supply Interruption
  • Estimated start time and water supply off: 15/11/2019 09:00 AM
    Estimated restore time and water supply back on: 15/11/2019 06:00 PM

    We’re improving your services and undertaking maintenance work in Toorak Gardens. Sometimes our crews need to temporarily interrupt the water supply to our customers and/or manage traffic while they are working. Temporary traffic management may remain in place until reinstatement of the impacted road is complete. We always aim to minimise inconvenience by restoring services as safely and quickly as we can.


  • See all scheduled works

Follow Us On