Consultant Engineers

Consultant Engineers

As of October 2018, SA Water is not accepting new applications for consultant accreditation, while we complete a review of the process.

Accredited Consultants

Infrastructure installed by means of a Land Developer Agreement shall be designed by a consultant engineer approved by SA Water.

Consultant Accreditation Information

The accreditation process involves consideration of the Consultancy’s engineering capability, quality systems and ability to provide the designs to the required standard.

SA Water Design Checklists

Forms to be provided with the Design Drawings:

Please note where a Consultancy has a Safety in Design proforma of an appropriate standard it may be acceptable as an alternative to the SA Water Safety in Design Checklist. Confirmation should be sought for the use of a company Safety in Design document.

The Consultant shall complete the required Checklists for each submission for audit by SA Water of the Design Drawings. The Checklists shall be signed by the Chartered Engineer.

Design Guidelines

Water

Sewer

Drawing Templates

As Constructed Guidelines

  • Major faults

  • Underway

  • Gilles Rd
  • Glen Osmond
  • 10/12/2019
  • Water Supply On
  • 11/12/2019 12:30 AM - We are attending to an incident in Glen Osmond with no interruption to the water supply. The safety of our crews and customers comes first, and we always aim to minimise inconvenience by restoring services as quickly as we can. Reference Number WO: 07250412.
  • See all major faults

  • Scheduled works

  • Underway
  • Ellis St
  • Magill
  • 11/12/2019
  • Temporary Supply Interruption
  • Estimated start time and water supply off: 12/12/2019 09:00 AM
    Estimated restore time and water supply back on: 12/12/2019 06:00 PM

    We’re improving your services and undertaking maintenance work in Magill. Sometimes our crews need to temporarily interrupt the water supply to our customers and/or manage traffic while they are working. Temporary traffic management may remain in place until reinstatement of the impacted road is complete. We always aim to minimise inconvenience by restoring services as safely and quickly as we can.


  • See all scheduled works