Requirements for Water Systems

Requirements for Water Systems

Water Services Association of Australia (WSAA)

  • Water Supply Code of Australia - WSA 03-2011

Supplementary Documentation

Water Supply Construction Manual Drawings

Links to these standard drawings can be found on our Standard Drawings page.

  • 4005-30001 - Index
  • 4005-30002 - General Information/Preferences
  • 4005-30003 - Excavation, Embedment & Trenchings
  • 4005-30004 - Allocation of Space for Services
  • 4005-30005 - Mainlaying
  • 4005-30006 - Water Connections
  • 4005-30007 - Access Chambers & Marker Posts
  • 4005-30008 - Meter Assemblies
  • 4005-30009 - Fire Services
  • 4005-30010 - Miscellaneous

Engineering Standards

Authorised Products

Links to these authorised products can be found on our Technical Standards page.

  • TS 0503 - Authorised Products for Water Systems
  • TS 0500 - Authorised Products for Maintenance of Water & Sewer Systems

  • Major faults

  • Reported

  • Roland Rd
  • Rostrevor
  • 11/12/2019
  • Water Supply Interrupted
  • Last Updated: 11/12/2019 08:31 AM - We are on site in Rostrevor and the nearby water supply may be unavailable until 11/12/2019 02:47 PM. Sometimes our crews need to temporarily interrupt the water supply to our customers and/or manage traffic while they are working. We always aim to minimise inconvenience by restoring supply as safely and quickly as we can. Reference Number WO: 07250518.
  • See all major faults

  • Scheduled works

  • Underway
  • Ellis St
  • Magill
  • 11/12/2019
  • Temporary Supply Interruption
  • Estimated start time and water supply off: 12/12/2019 09:00 AM
    Estimated restore time and water supply back on: 12/12/2019 06:00 PM

    We’re improving your services and undertaking maintenance work in Magill. Sometimes our crews need to temporarily interrupt the water supply to our customers and/or manage traffic while they are working. Temporary traffic management may remain in place until reinstatement of the impacted road is complete. We always aim to minimise inconvenience by restoring services as safely and quickly as we can.


  • See all scheduled works